Question1: Your customer experienced some problems caused by outdated HPE Superdome Flex firmware. Which update method should they use to avoid these issues in the future?

Question2: Which statement about manual orchestration during the firmware update is true?

Question3: Match each HPE OneView network type with its definition.

Question4: You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView.
Put the steps to achieve this goal into the coned order in the answer area on the right.

Question5: Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.

Question6: Refer to the exhibit.

Which statement about this logical interconnect group is true?

Question7: Which tool can be used to evaluate me health of an HPE Oneview appliance before proceeding with an appliance updated.

Question8: Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.
When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.
What must be done to fix this issue?

Question9: What is a restriction of using a RoCE network?

Question10: Match HPE SimpliVity team with the definition.

Question11: What is one of me benefits of using HPE Composer 2?

Question12: Your customer reports that they cannot deploy HPE Synergy compute nodes using HPE OneView for VMware vCenter Server (HPE OV4VC).
What should you check during troubleshooting process?

Question13: Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?

Question14: Your customer needs to move an application from an HPE Synergy 480 Gen10 Compute Module to an HPE Synergy 660 Gen 10 Compute Module. The 480 has a switch that has been manually zoned outside of HPE OneView.
What must the customer do before migrating the application?

Question15: Your customer wants to compare HPE Superdome Flex with HPE Superdome Flex 280.
Which statement about these two systems is true?

Question16: Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer's needs?

Question17: Which statement about the SY480 Gen10 Plus Compute Module is true?

Question18: Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.

Question19: Refer to the exhibit.

Which statement about this logical JBOD is true?

Question20: Your customer has the following HPE Synergy setup
- 3 HPE Synergy 12000 Frames
- 4 HPE Virtual Connect SE 100 Gb F32 Modules
- 2 HPE Synergy 50 GO Interconnect Link Modules
- 36 HPE Synergy 480 Gen10 Plus compute modules
- 2 HPE Composer 2 modules
Which statement about this setup is true?

Question21: Refer to the exhibit.

Which statement about this logical interconnect group is true?